Installation of return vapor compressors and related accessories

Installation of return vapor compressors and related accessories

Project: Installation of return vapor compressors and related accessories of south Pars Phase 15-16. Employer: Persian Gulf Petrochemical Industries Co. – Aria Naft Shahab Company Duration: December 2018 to Present (Under construction) Activities: All activities related to installation of mechanical equipment (static and rotary), piping, electric and instrumentation and control …

Client: Persian Gulf Petrochemical Industries Co. – Aria Naft Shahab South Pars Economic Energy Zone, Assaluyeh 2018
Details
Bid Boland II Behbahan Petrochemical company.

Bid Boland II Behbahan Petrochemical company.

Project: Bid Boland II Behbahan Petrochemical company. Employer: Persian Gulf Petrochemical Industries Co. - Steam Company Duration: July 2018 to Present (Under construction) Activities: Constructing of Non industrial buildings. (Office Building, Amphitheater and Mosque) 1- All Civil framing and installation work activities 2- All Mechanical framing and installation work activities …

Client: Persian Gulf Petrochemical Industries Co. - Steam Company 2018
Details
All Electrical, Control and Instrumentation systems and Telecom

All Electrical, Control and Instrumentation systems and Telecom

Project: All Electrical, Control and Instrumentation systems and Telecom System Installation, Pre-commissioning and commissioning of South Pars Phase 22-23-24 Duration: October 2017 to Present (Under construction) Employer: Petro Sina Aria Oil and Gas Co. Activities: Completion of construction and installation, pre-commissioning, punch clearing, commissioning and startup in the field of …

Client: Petro Sina Aria Oil and Gas Co. South Pars Economic Energy Zone, Assaluyeh 2017
Details
Bid Boland II Behbahan Petrochemical company.

Bid Boland II Behbahan Petrochemical company.

Project: Bid Boland II Behbahan Petrochemical company. Employer: Sazeh Pad Tehran Duration: Juley 2017 to Present (Under construction) Activities: Installation; Pre commissioning and commissioning of electrical and instrumentation systems including as below: 1- Installation of electrical and instrument systems equipment 2- Fire alarm system 3- Wire and cable laying 4- …

Client: Sazeh Pad Tehran 2017
Details
NASR Consortium ( Phase 12 South Pars)

NASR Consortium ( Phase 12 South Pars)

NASR Consortium ( Phase 12 South Pars) Insallation & commissioning of electrical & mechanical equipment of offsite buildings Activity list of contract: 1. Conduit piping in different sizes, 37933 m 2. Metal work and supporting, 18 Ton 3. Cabling with armored cable 1.5*2- 2.5*2, m25000 4. Scaffolding, 41418 m^3 5. …

South Pars Economic Energy Zone, Assaluyeh 2000
Details
Water research institute:

Water research institute:

Water research institute: Procurement, installation, commissioning of river over flow detecting system for Azarbayjan SEFID ROUD Activity list of contract: 1. Construction and equipment installation of 28 weather stations. 2. Construction and equipment installation of 13 hydrometery stations. 3. Construction and equipment installation of 70 local alarm stations. 4. Construction …

Details
O.I.E.C (RAMSHIR):

O.I.E.C (RAMSHIR):

O.I.E.C (RAMSHIR): Installation and Pre Commissioning of electrical and instrument of Phase 10&9 (South Pars Economic Energy Zone) (Jan 2007 to Feb 2009) This project include all electrical and instrument works at Phase 10&9 , area C. Electrical works: 1. Installation, test & oil treatment of 18 set power transformers. …

South Pars Economic Energy Zone, Assaluyeh 2007
Details
A.Z.A.A.N CONSORTIUM – Installation of electrical and instrument of

A.Z.A.A.N CONSORTIUM – Installation of electrical and instrument of

A.Z.A.A.N CONSORTIUM – Installation of electrical and instrument of Offsite Lines of Petrochemical Zone ( Mobin Petrochemical Company), South Pars Special Economic Zone (Assaluye), And Installation, testing, alignment and pre-commissioning of fire fighting water pump stations. (Apr 2005 to Feb 2008) Electrical works: 1. Installation of 243 Cell Panel (MV …

South Pars Economic Energy Zone, Assaluyeh 2005
Details
MEAM TEAM –ASFALT TOUS CONSORTIUM:  Installation of Heavy Equip-

MEAM TEAM –ASFALT TOUS CONSORTIUM: Installation of Heavy Equip-

MEAM TEAM –ASFALT TOUS CONSORTIUM: Installation of Heavy Equip- ments, Furnaces and Pumps and Installation of Refractory of Incineration Petrochemical Zone ( Mobin Petrochemical Company) In South Pars Special Economic Zone (Assaluye), (Nov 2006 to Sep 2007) Electrical works: 1. Installation of Heavy equipments , pumps , ducts , 896,000 …

South Pars Economic Energy Zone, Assaluyeh 2006
Details
RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (

RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (

RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins ( Main Unit of Jam Petrochemical ) In South Pars Special Economic Zone (Asaluye), (April 2004 to January 2005.) Electrical works: 1. Installation of 126 Cell Panel (MV , LV , UPS , Capacitor Bank , NGR , Wall mounted) …

South Pars Economic Energy Zone, Assaluyeh 2004
Details
UNIGULF Co.  Erection, testing and commissioning

UNIGULF Co. Erection, testing and commissioning

UNIGULF Co. Erection, testing and commissioning of cathodic protection of Pipeline for C2 Recovery (Assaluye) (2003 to 2004) -1 Management of petrochemical feed line test by pigging method and pig system. -2 Installation of instrument for dry strand pipeline 56 and 32 inch

South Pars Economic Energy Zone, Assaluyeh 2003
Details
SEPAH MARINE CORPS – EPC (Engineering, procurement and construction

SEPAH MARINE CORPS – EPC (Engineering, procurement and construction

SEPAH MARINE CORPS – EPC (Engineering, procurement and construction of buildings, tanks, piping and other works of sepah marine corps station / JASK) (1999 -1997) Civil works: 1. Construction of concrete tank (for water storage) , Vol = 6000 m3 2. Construction of concrete tank (for daily water storage) , …

Jask, Hormozgan 1999
Details