RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (
Location South Pars Economic Energy Zone, Assaluyeh
Year 2004

RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (
Main Unit of Jam Petrochemical ) In South Pars Special Economic Zone
(Asaluye), (April 2004 to January 2005.)
Electrical works:
1. Installation of 126 Cell Panel (MV , LV , UPS , Capacitor Bank , NGR , Wall
mounted)
2. Installation of 6 set busduct LV.
3. Fabrication and installation of 28 ton Support, 23,500 Meter ladder, 1800
meter conduit.
4. Installation of 13 Km lighting cables.
5. Installation of 439 Nos. Explosion proof lighting fixtures and 515 Nos.
Lighting junction boxes.
6. Installation of main post transformers: 20/33 KV, 6.6/20 KV, 0.4/6.6 KV.
Instrument works:
1. Fabrication and installation of 10 ton Support, 2300 Meter tray.