NASR Consortium ( Phase 12 South Pars)
Insallation & commissioning of electrical & mechanical equipment of
offsite buildings
Activity list of contract:
1. Conduit piping in different sizes, 37933 m
2. Metal work and supporting, 18 Ton
3. Cabling with armored cable 1.5*2- 2.5*2, m25000
4. Scaffolding, 41418 m^3
5. Wiring, 58551 m
6. Cabling with PVC cable -Low size, 9235 m
7. Buldings outlet socket system installation-LCS, 817 pcs.
8. Lighting panel installation -ELP, 330 pcs.
9. F&G panel installation, 200 pcs.
10. UPS installation for emegency power system, 100 pcs.
11. NLP system equipment installation, 610 pcs.
12. Earth cabling, 2000 m
13. Lighting pole and socket installation, 13850 pcs.
14. IT system equipment installation, 5062 pcs.
15. F&G system equipment installation, 1747, pcs.
16. Heating and cooling fancoil installation, 3863 pcs.
17. PA/GA equipment installation, 2567 pcs.
18. Outdoor lighting, 199 pcs.
19. Ladder and cable tray installation, 850 m
20. Ducting for HVAC system,1220 m^3
21. Piping for HVAC hot and cold water, 1200 m
22. Fire fighting piping, 680 m
23. Heat insolation for HVAC ducts, 3122 m^3
24. Piping for HVAC, F.F, Service water.
25. Indoor Lighting panel, 330 pcs.
26. UPS panels, 100 pcs.
27. LV, 400 V, 24 cells
28. MV, 20 KV, 12 cells.