FA EN AR ZH
Energy Peyman
Energy Peyman Mechanical, Electrical & Instrumentation Engineering Company
  • Home
  • Services
  • Projects
  • Equipment
  • About Us
  • Contact Us
Gallery

Gallery

Project photography from sites executed across Iran.

Home / Gallery
All پروژه‌ها تجهیزات تیم سایر
Photo 1
Photo 1
Photo 2
Photo 2
What will be followed below is the work description of a company which has
What will be followed below is the work description of a company which has
Can be mention From 2003 to 2007 Energy Peyman has had simultaneous
Can be mention From 2003 to 2007 Energy Peyman has had simultaneous
participation in major projects in phase 1of South Pars petrochemical area.
participation in major projects in phase 1of South Pars petrochemical area.
ACTIVITY LIST, Scope of Electrical:
ACTIVITY LIST, Scope of Electrical:
- Panel installation for power LV- MV-MCC-Switch gear
- Panel installation for power LV- MV-MCC-Switch gear
(Energy Peyman Co.=EPCo.) is a registered contractor as rated 3 for "Power" & 3
(Energy Peyman Co.=EPCo.) is a registered contractor as rated 3 for "Power" & 3
for "Industrial Equipment" and 5 for "Civil" & “Industry & Mine”. EPCo has got its
for "Industrial Equipment" and 5 for "Civil" & “Industry & Mine”. EPCo has got its
ISO 9001:2008 in engineering and procurement and construction for industrial
ISO 9001:2008 in engineering and procurement and construction for industrial
projects from URS:UKAS, England. EPCo is member of society of engineering &
projects from URS:UKAS, England. EPCo is member of society of engineering &
contractor company for oil & gas & petrochemy companies.EPCo. As a technical
contractor company for oil & gas & petrochemy companies.EPCo. As a technical
and engineering company to exeute huge projects, is committed to quality rules
and engineering company to exeute huge projects, is committed to quality rules
and follows below mentioned goals during executing projects:
and follows below mentioned goals during executing projects:
1. Precise control of different steps of projects based on time scheduled activity
1. Precise control of different steps of projects based on time scheduled activity
2. Continuous effort to increase clients satisfactions.
2. Continuous effort to increase clients satisfactions.
3. To obey the internationals and local laws and standards.
3. To obey the internationals and local laws and standards.
4. Continuous human resource training.
4. Continuous human resource training.
Photo 19
Photo 19
Photo 20
Photo 20
Photo 21
Photo 21
Photo 22
Photo 22
Photo 23
Photo 23
Photo 24
Photo 24
Project: Installation of return vapor compressors and related accessories
Project: Installation of return vapor compressors and related accessories
Project: Bid Boland II Behbahan Petrochemical company.
Project: Bid Boland II Behbahan Petrochemical company.
Project: All Electrical, Control and Instrumentation systems and Telecom
Project: All Electrical, Control and Instrumentation systems and Telecom
Project: Bid Boland II Behbahan Petrochemical company.
Project: Bid Boland II Behbahan Petrochemical company.
Water research institute:
Water research institute:
Procurement, installation, commissioning of river over flow  detecting
Procurement, installation, commissioning of river over flow detecting
O.I.E.C (RAMSHIR):
O.I.E.C (RAMSHIR):
Installation and Pre Commissioning of electrical and instrument of Phase
Installation and Pre Commissioning of electrical and instrument of Phase
A.Z.A.A.N CONSORTIUM – Installation of electrical and instrument of
A.Z.A.A.N CONSORTIUM – Installation of electrical and instrument of
Offsite Lines of Petrochemical Zone ( Mobin Petrochemical Company),
Offsite Lines of Petrochemical Zone ( Mobin Petrochemical Company),
MEAM TEAM –ASFALT TOUS CONSORTIUM:  Installation of Heavy Equip-
MEAM TEAM –ASFALT TOUS CONSORTIUM: Installation of Heavy Equip-
ments, Furnaces and Pumps and Installation of Refractory of Incineration
ments, Furnaces and Pumps and Installation of Refractory of Incineration
RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (
RAMSHIR C.T.C. Installation of electrical and instrument of 10Th Olefins (
Main Unit of Jam Petrochemical ) In South Pars Special Economic Zone
Main Unit of Jam Petrochemical ) In South Pars Special Economic Zone
SEPAH MARINE CORPS – EPC (Engineering, procurement and construction
SEPAH MARINE CORPS – EPC (Engineering, procurement and construction
of buildings, tanks, piping and other works of sepah marine corps station /
of buildings, tanks, piping and other works of sepah marine corps station /
SHAHID TAHERI STORE (N.I.G.C) EPC (Engineering, procurement and
SHAHID TAHERI STORE (N.I.G.C) EPC (Engineering, procurement and
construction of All electrical work / SAVEH ) (1995 -1994)
construction of All electrical work / SAVEH ) (1995 -1994)
Project: Nouri (Previously Borzouyeh) Petrochemical Company.
Project: Nouri (Previously Borzouyeh) Petrochemical Company.
Phase 9&10 South pars-Area C-Train no -1JB Installation
Phase 9&10 South pars-Area C-Train no -1JB Installation
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Post NO -6  transformer 11/33 kv
Phase 9&10 South pars-Area C-Post NO -6 transformer 11/33 kv
Phase 9 & 10 South pars - Area C - LV Post NO 6
Phase 9 & 10 South pars - Area C - LV Post NO 6
Phase 9&10 South pars-Area C-LV Post NO -6 Dry transformer
Phase 9&10 South pars-Area C-LV Post NO -6 Dry transformer
Phase 9 & 10 South pars - Area C - LV Post NO 6 - battery room
Phase 9 & 10 South pars - Area C - LV Post NO 6 - battery room
Phase 9&10 South pars-Area C-LV Post NO -6
Phase 9&10 South pars-Area C-LV Post NO -6
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Train no -1LCB control station
Phase 9&10 South pars-Area C-Post NO -6
Phase 9&10 South pars-Area C-Post NO -6
Cabling and tray installation for main train
Cabling and tray installation for main train
Phase 9&10 South pars-Area C-earth bar and
Phase 9&10 South pars-Area C-earth bar and
earth connection to main train pipe rack
earth connection to main train pipe rack
Phase 9&10 South pars-Area C-Post NO -6  transformer 11/33 kv
Phase 9&10 South pars-Area C-Post NO -6 transformer 11/33 kv
Phase 9&10 South pars-Area C-Post NO -6  transformer 0.4/6 kv and bus duct
Phase 9&10 South pars-Area C-Post NO -6 transformer 0.4/6 kv and bus duct
Phase 9&10 South pars-Area C-Post NO -6
Phase 9&10 South pars-Area C-Post NO -6
Phase 9&10 South pars-Area C-LV Post NO -6HV panel
Phase 9&10 South pars-Area C-LV Post NO -6HV panel
switch gear test and start up
switch gear test and start up
Phase 9&10 South pars-Area C-Post NO -6
Phase 9&10 South pars-Area C-Post NO -6
Cabling and tray installation for main train
Cabling and tray installation for main train
Phase 9&10 South pars-Area C-analizer room -train NO 1
Phase 9&10 South pars-Area C-analizer room -train NO 1
Phase 9&10 South pars-Area C-valve calibration shop
Phase 9&10 South pars-Area C-valve calibration shop
Phase 9&10 South pars- Special  store area for cable drums
Phase 9&10 South pars- Special store area for cable drums
Phase 9&10 South pars-Area C-LV Post NO -6HV panel cable connection
Phase 9&10 South pars-Area C-LV Post NO -6HV panel cable connection
Installation of Cable Ladder and Cable Pulling (with Scaffolding)
Installation of Cable Ladder and Cable Pulling (with Scaffolding)
(Substation 6, Area C, Phase 10&9, Gas Plant)
(Substation 6, Area C, Phase 10&9, Gas Plant)
Phase 9&10 South pars -area lighting
Phase 9&10 South pars -area lighting
Phase 9&10 South pars-Area C-control room NO 8
Phase 9&10 South pars-Area C-control room NO 8
Phase 9&10 South pars -area lighting
Phase 9&10 South pars -area lighting
Installation of Cable Ladder and Cable Pulling (with Scaffolding)
Installation of Cable Ladder and Cable Pulling (with Scaffolding)
(Substation 6, Area C, Phase 10&9, Gas Plant)
(Substation 6, Area C, Phase 10&9, Gas Plant)
Phase 9&10 South pars -area lighting
Phase 9&10 South pars -area lighting
Phase 9&10 South pars-Area C-control room NO 8
Phase 9&10 South pars-Area C-control room NO 8
Phase 9&10 South pars-Area C-PG Canduit pipng
Phase 9&10 South pars-Area C-PG Canduit pipng
Phase 9&10 South pars-Area C-Post NO -6
Phase 9&10 South pars-Area C-Post NO -6
Cabling and tray installation for main train
Cabling and tray installation for main train
Installation of Bag Filter Ducts (Incineration Plant MOBIN Utility Complex)
Installation of Bag Filter Ducts (Incineration Plant MOBIN Utility Complex)
Installation of  Ducts (Incineration Plant MOBIN Utility Complex)
Installation of Ducts (Incineration Plant MOBIN Utility Complex)
Installation of  Pumps (Incineration Plant - MOBIN Utility Complex)
Installation of Pumps (Incineration Plant - MOBIN Utility Complex)
Installation of Fire Water Diesel Pump
Installation of Fire Water Diesel Pump
Water Center Substation- MOBIN Petrochemical Co.
Water Center Substation- MOBIN Petrochemical Co.
Stacks , Bag Filters  Incineration Plant  - MOBIN Utility Complex
Stacks , Bag Filters Incineration Plant - MOBIN Utility Complex
Installation of Refractory  (Incineration Plant MOBIN Utility Complex)
Installation of Refractory (Incineration Plant MOBIN Utility Complex)
Installation of  Bag Filters Incineration Plant  MOBIN Utility Complex
Installation of Bag Filters Incineration Plant MOBIN Utility Complex
Electrical & Instrument Control System Tabriz Petrochemical Co.
Electrical & Instrument Control System Tabriz Petrochemical Co.
Installation of Gas Control Detection Tabriz Petrochemical
Installation of Gas Control Detection Tabriz Petrochemical
Installation of Equipment  Arak Petrochemical Co.
Installation of Equipment Arak Petrochemical Co.
Laying of  Electrical Cables Arak Petrochemical Co.
Laying of Electrical Cables Arak Petrochemical Co.
(Zone Building Pump Station – Mobin Petrochemical Co.)
(Zone Building Pump Station – Mobin Petrochemical Co.)
Alignment of Fire water Pump Mobin Petrochemical Co.
Alignment of Fire water Pump Mobin Petrochemical Co.
Finalize of Electrical Pumps Mobin Petrochemical Co
Finalize of Electrical Pumps Mobin Petrochemical Co
Alignment of Fire water Pump Mobin Petrochemical Co.
Alignment of Fire water Pump Mobin Petrochemical Co.
Stack Unit 57 Incineration Plant  - MOBIN Utility Complex
Stack Unit 57 Incineration Plant - MOBIN Utility Complex
Fabrication of Tanks Incineration Plant  - MOBIN Utility Complex
Fabrication of Tanks Incineration Plant - MOBIN Utility Complex
Electrical & Instrument works Arak Petrochemical Co.
Electrical & Instrument works Arak Petrochemical Co.
Stack Unit 57 Incineration Plant  - MOBIN Utility Complex
Stack Unit 57 Incineration Plant - MOBIN Utility Complex
Stack Unit 57 Incineration Plant  - MOBIN Utility Complex
Stack Unit 57 Incineration Plant - MOBIN Utility Complex
Stack Unit 57 Incineration Plant  - MOBIN Utility Complex
Stack Unit 57 Incineration Plant - MOBIN Utility Complex
installation & setting of control valves
installation & setting of control valves
METAL WORK & PIPE RACK
METAL WORK & PIPE RACK
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF INSTRUMENT & PIPES, TRAIN 2,
HEAT TRACING OF INSTRUMENT & PIPES, TRAIN 2,
AREA C, PHAZE 10 & 9 SOUTH PARS
AREA C, PHAZE 10 & 9 SOUTH PARS
calibration of safety & relief valves
calibration of safety & relief valves
Vaccume Dead Weight Tester
Vaccume Dead Weight Tester
Portable Pressure Calibrators
Portable Pressure Calibrators
Pressure Gauge Calibration
Pressure Gauge Calibration
Pressure Dead Weith Tester
Pressure Dead Weith Tester
4.5 Digit Multi Meter With High Voltage Probe
4.5 Digit Multi Meter With High Voltage Probe
Disturtion Analyzer
Disturtion Analyzer
Frequency And Power Measurement & Generation
Frequency And Power Measurement & Generation
Calibration Of Multi-Process Calibrature Vs 8.5 Digit Refrence Multimeter
Calibration Of Multi-Process Calibrature Vs 8.5 Digit Refrence Multimeter
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)
Energy Peyman's Engeeniring Camp At South Pars (Assalouyeh)
Energy Peyman's Engeeniring Camp At South Pars (Assalouyeh)
Calibration Of PRT Sencore With SPRT Sencore On Liqude Bath
Calibration Of PRT Sencore With SPRT Sencore On Liqude Bath
Themprature Bath
Themprature Bath
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)

Energy Peyman

Introduction — Energy Peyman Co.

What will be followed below is the work description of a company which has been able to participate in industrial development of the country despite of several obstacles. Although Energy Peyman(Ltd.) was registered in may 1993, it was based upon the efforts of its founder in oil, gas, and petrochemical industries. These efforts started in late 60’s in oil extraction and export industries, devel- oped in 70’s in the petrochemical industries. During the 80’s this development continued in the form of industrial factories due to the necessity of serving the country. During the next two decades the activities were resumed in the oil, gas and petrochemical area. Energy Peyman is a specialized company in performing installation and commissioning of electrical equipment, instruments and rotary machineries in oil and gas industries. The company has a comprehensive vision towards the quality of contracting jobs. Due to its high level commitment, even under most difficult circum- stance, Energy Peyman keeps workshops alive and gives the highest priority to accomplishment of the job. What makes Energy Peyman’s managers and staff distinguishable from others, is the company’s mission for performing the projects perfectly and that every one, observing the national and international standards is a must. Along with its project orientation nature, Energy Peyman commits itself create jobs for people and to cherish its human resources as its most impor- tant asset. What is mentioned below, is a glance at Energy Peyman activation during its 15 year of presence as a factory contractor & establisher. The latest project of Energy Peyman company which is under development now is the installation and commissioning of Electrical equipment and Instru- ment devices in Area C of the expansion project for phrases 10 & 9 in the South Pars refinery. This project is now of the end of installation phase and aims to resolve the problems & issues regarding home-used gas. The details of executive plans and the activation of each Energy Peyman's departments in this national project is mentioned in the comprehensive index of the company's activities .As a summary of the activities, installation of more than 700 km of different cables , manufacturing & installation of more than 200,000 kg of steel support, installation of nearly 400 cells of power & control panels, calibration of more than 3000 precise instruments & control valves. Can be mention From 2003 to 2007 Energy Peyman has had simultaneous participation in major projects in phase 1of South Pars petrochemical area. During 2007-2006 Energy Peyman has performed the installation of more than 1800 tons of stationary & rotary equipment, refractory material & steel tanks. Other projects performed by Energy Peyman in 2007-2005 can be listed as: Implementing a large off-site power & instrument network in Mobin petro- chemical .(connecting 6 petrochemical plants with power , water & gas production units ). Implementing 3 water pumping stations for fire fighting plants. (including installation & commissioning of different machinery , power panels in substa- tion & measuring equipment). Implementing main Substation & control room 10th Olefin unit for Jam petro- chemical company is another Energy Peyman project which has been accom- plished in 2004. In 2003, Energy Peyman has been in charge of cathodic protection of gas feed pipes and hydro testing of installed pipes, in south pars zone. In 1998-1996, before participating in South Pars economical energy zone, Energy Peyman has been in charge of construction of Naval base in Jask harbour. This project includes implementing of power transmission network & power plant, Telecommunication network, Concrete water tank, Pumping station and Water transmission pipeline. Prior to the projects mentioned above, in 1996-1994 in Tabriz petrochemical . Energy Peyman has performed the implementation of the entire power equipment of its power plants ,precise instruments of the laboratories . During the first few years of the company's establishment, Energy Peyman has been in charge of implementing power network of the largest warehouse of Iran's national oil company in saveh .In this project more than 600 km of cabling has been performed accompanied by necessary construct- ing tasks, installation lighting, earthing, fire alarms &power plant equipment. What briefly mentioned above, was a summary of the activation of a compa- ny with experienced & committed staff which has a recognizable working history .we wish that we can confine this trend for the good of our country.
40+ Years Experience 50+ Successful Projects 100+ Expert Staff
Continue

Quick Links

  • Home
  • Services
  • Projects
  • Equipment
  • About Us
  • Contact Us
  • Certificates
  • Gallery
  • FAQ

Our Services

  • Electrical Services
  • Mechanical Services
  • Piping Services
  • SANJESHGARAN NIROO ENERGY — Reference Calibration Lab.

Contact Us

  • Central Office Second Floor, No.141, Taleghani Ave., Tehran, Iran
  • Phone (+9821) 88301846, 88349147, 88349254

Our Certificates

ISO 9001:2008 Quality Management System ISO 9001:2008 Quality Management … Industrial Contractor Qualification Industrial Contractor Qualification Oil, Gas & Petrochemical Contractors Association Oil, Gas & Petrochemical … Society of Engineering & Contractor Companies Society of Engineering & … Industrial Contractor Qualification Certificate Industrial Contractor Qualification Certificate Industrial Contractor Qualification Certificate (II) Industrial Contractor Qualification Certificate …

© 2026 Energy Peyman — All Rights Reserved