TABRIZ PETROCHEMICAL COMPLEX – With NAVROOD Co. Joint Venture
(Erection, test and commissioning of substations and main laboratory
Installation of all electrical devices for 4 set 20 KV Substation included :
A- 10 Set transformers (7.5 , 4.2 , 2 MVA)
B- 22 Cell MV panels.
C- 43 Cell LV panels.
D- 32 Cell Control panels. (Connection to ITR)
Installation of all electrical system for main Substations(4 & 1,2,3), UTILITY
buildings , Central Laboratory and N.D.T Laboratory included:
A- Installation of building lighting system.
B- Installation of building fire alarm system.
C- Installation of earthing system.
D- Installation of telecommunication system.
E- Installation of cathodic protection system.
Installation of all instrument devices for Central Laboratory included:
A- Installation of LAB devices.
B- Installation of all tubes.
Installation of all mechanical system for Central Laboratory included:
A- Installation of U/G piping.
B- Installation of A/G piping.
C- Installation of plumbing piping.
D- Installation of 8000 meter pipes for production (for Central Laboratory)
Installation of all mechanical system for Other Building and Central Laborato-
ry included:
A- Installation of fire fighting piping and hydrants.
B- Installation of CO2 piping and devices.