What will be followed below is the work description of a company which has
Project: All Electrical, Control and Instrumentation systems and Telecom
O.I.E.C (RAMSHIR):
Installation and Pre Commissioning of electrical and instrument of Phase
Project: Nouri (Previously Borzouyeh) Petrochemical Company.
Phase 9&10 South pars-Area C-LV Post NO -6HV panel
switch gear test and start up
Phase 9&10 South pars-Area C-Post NO -6
Cabling and tray installation for main train
Phase 9&10 South pars-Area C-analizer room -train NO 1
Phase 9&10 South pars-Area C-valve calibration shop
Phase 9&10 South pars- Special store area for cable drums
Phase 9&10 South pars-Area C-LV Post NO -6HV panel cable connection
installation & setting of control valves
METAL WORK & PIPE RACK
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF TRAIN 1, AREA C, PHAZE 10 & 9 SOUTH PARS
HEAT TRACING OF INSTRUMENT & PIPES, TRAIN 2,
AREA C, PHAZE 10 & 9 SOUTH PARS
calibration of safety & relief valves
Vaccume Dead Weight Tester
Portable Pressure Calibrators
Pressure Gauge Calibration
Pressure Dead Weith Tester
4.5 Digit Multi Meter With High Voltage Probe
Disturtion Analyzer
Frequency And Power Measurement & Generation
Calibration Of Multi-Process Calibrature Vs 8.5 Digit Refrence Multimeter
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)
Energy Peyman's Engeeniring Camp At South Pars (Assalouyeh)
Calibration Of PRT Sencore With SPRT Sencore On Liqude Bath
Themprature Bath
Energy Peyman's Engeeniring Office At South Pars (Assalouyeh)